Research on Applicability of Different Material Cable Brackets to Cable Operation
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference [18]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    Under the effect of high current,the conductivity of the cable bracket will change the magnetic field distribution around the cable,affecting the operation and leading to changes in temperature.Conventional electricity standards and regulations has not given a clear explanation of the selection cable support.In this paper,we take NanXu 220 kV substation as an example,the effects of different current carrying capacity and cable materials on the temperature rise of cable are studied by using two-dimensional electromagnetic-fluid-temperature field coupling finite element analysis method.Analysis showed that the temperature rise of cable support due to eddy currents of different materials will not endanger the safety of human and equipment,whether uses a non-magnetic material depends on eddy currents and economy.This article breaks through the limitations of traditional cable temperature calculation,taking into account the impact of cable support,given the theory and practical application foundation when selecting the material,it has important significance in improving the construction s economy and the operational reliability.

    Reference
    [1]马国栋.电线电缆载流量[M].北京:中国电力出版社,2003:149-154. MA Guodong.Wire and cable ampacity[M].Beijing:China Electric Power Press,2003:149-154.
    [2]王雨阳,王永强,王 浩,等.一起110 kV电缆终端特殊部位发热的分析处理[J].江苏电机工程,2014,33(1):9-10. WANG Yuyang,WANGYongqiang,WANGHao,etal. Analysis and treatment of a special 110 kV cable terminal[J]. Jiangsu Electrical Engineering,2014,33(1):9-10.
    [3]牛海清,王晓兵,蚁泽沛,等.110 kV单芯电缆金属护套环流计算与试验研究[J].高电压技术,2005,31(8):15-17. NIU Haiqing,WANG Xiaobing,YI Zepei,et al.Study on circulating current of 110 kV singlecore cable[J].High Voltage Engineering,2005,31(8):15-17.
    [4]叶冠豪,郭湘奇,王一磊,等.XLPE电缆交叉互联系统接地直流电流在线监测[J].江苏电机工程,2016,35(3):39-45. YE Guanhao,GUO Xiangqi,WANG Yilei,et al.On line monitoring of ground direct current in XLPE cable cross connect system[J].High Voltage Engineering,2016,35(3):39-45.
    [5]GB 50217—2007不规则排列电缆温度场及载流量计算[S].2007. GB 50217—2007 Calculation of temperature field and Ampacity of irregular cables[S].2007.
    [6]国家电网.国家电网公司关于印发电力电缆通道选型与建设指导意见的通知[Z].国家电网运检[2014]35号. SG.Notice of the guiding opinions on the selection and constructionofpowercablechannels[Z].SGInspection[2014]35.
    [7]DL/T 5221—2005城市电力电缆线路设计技术规定[S].2005. DL/T 5221—2005 Technical specification for design of urban power cable lines[S].2005.
    [8]王世山,刘泽远,杜亚平,等.双向间接耦合有限元法预估电力电缆载流量[J].南京航空航天大学学报,2010,42(2):133-139. WANG Shishan,LIU Zeyuan,DU Yaping,et al.Bidirectional indirect coupled finite element method for estimating ampacity of power cable[J].Nanjing University of Aeronautics and Astronautics,2010,42(2):133-139.
    [9]梁永春,柴进爱,李彦明,等.有限元法计算交联电缆涡流损耗[J].高电压技术,2007,33(9):196-199. LIANG Yongchun,CHAI Jinai,LI Yanming,et al.The finite element method to calculate eddy current loss crosslinked cable[J].High Voltage Technology,2007,33(9):196-199.
    [10]梁永春,王忠杰,刘建业,等.排管敷设电缆群温度场和载流量数值计算[J].高电压技术,2010,36(3):763-768. LIANG Yongchun,WANG Zhongjie,LIU Jianye,et al.Numerical calculation of temperature field and ampacity of cables in ducts[J].High Voltage Technology,2010,36(3):763-768.
    [11]郑雁翎,仪 涛,张冠军,等.分散式排管敷设电缆群温度场的流固耦合计算[J].高电压技术,2010,36(6):1566-1571. ZHENG Yanling,YI Tao,ZHANG Guanjun,et al.Fluidsolid coupling computation on temperature field of decentralized pipe cable system[J].High Voltage Technology,2010,36(6):1566-1571.
    [12]VAUCHERET P,HARTLEIN R A,BLACK W Z B.Ampacity derating factors for cables buried in short segments of conduit[J].IEEE Transactions on Power Delivery,2005,20(2):560-565.
    [13]王有元,陈仁刚,陈伟根,等.有限元法计算地下电缆稳态温度场及其影响因素[J].高电压技术,2009,34(12):3086-3092. WANG Youyuan,CHEN Rengang,CHEN Weigen,et al.Calculation of static temperature field of buried cable based on FEM and analysis of influential factors[J].High Voltage Technology,2009,34(12):3086-3092.
    [14]GAGGIDO C,OTERO A F,CIDRAS J.Theoretical model to calculate steadystate and transient ampacity and temperature in buried cables[J].IEEE Transactions on Power Delivery,2003,18(3):667-677.
    [15]梁永春,李延沐,李彦明,等.利用模拟热荷法计算地下电缆稳态温度场[J].中国电机工程学报,2008,28(16):129-134. LIANG Yongchun,LI Yanmu,LI Yanming,et al.Calculation of the static temperature field of underground cables using heat charge simulation Method[J].Proceedings of the CSEE,2008,28(16):129-134.
    [16]刘毅刚,罗俊华.电缆导体温度实时计算的数学方法[J].高电压技术,2005,31(5):52-54. LIU Yigang,Luo Junhua.Mathematical method of temperaturecalculation of power cable conductor in real time[J].High Voltage Technology,2005,31(5):52-54.
    [17]刘 畅.电力电缆载流量与温度场计算软件设计[D].杭州:浙江大学,2015. LIU Chang.Calculation software design on ampacity and temperature field of power cables[D].Hangzhou:Zhejiang university,2015.
    [18]罗涛.电力电缆温度场及载流量计算方法研究[D].重庆:重庆大学,2009. LUO Tao.The study on the temperature field and ampacity calculation of powercables[D].Chongqing:Chongqing University,2009.
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 03,2016
  • Revised:January 05,2017
  • Adopted:February 20,2017
  • Online: May 27,2017
Article QR Code