In the initial stage of generator load-shedding,generator power sag protection devices can judge quickly and shut down safely.Power oscillation was caused by a power plant outlet line failure.The transmission cycle of the generator power transmitter was not matched with the set of steam turbine digital electro-hydraulic control system,and the waveform was distorted.In turn,the unit control valve was shut down by mistake,and the action of power sag protection caused the generator-tripping.This paper analyzes the causes of this action and puts forward some suggestions on how to prevent and solve similar problems in large units.
[1] 乔永成,寇海荣,王云辉,等.发电机零功率保护[J].电力自动化设备,2011,31(5):148-151. QIAO Yongcheng,KOU Hairong,WANG Yunhui, et al. Zero power protection of generator[J]. Electric Power Automation Equipment,2011,31(5):148-151.
[2] 林长鹏,张晓亮,张宝红.火力发电厂零功率保护整定计算方法[J].黑龙江电力,2013,35(2):156-158. LIN Changpeng,ZHANG Xiaoliang,ZHANG Baohong. Setting calculation of zero-power protection for thermal power plant[J]. Heilongjiang Electric Power,2013,35(2):156-158.
[3] 兀鹏越,杨博,王海涛,等.火电机组零功率保护的应用研究[J].中国电力,2014,47(9):107-111. WU Pengyue,YANG Bo,WANG Haitao, et al. Application research of zero power protection for thermal power plants[J]. Electric Power,2014,47(9):107-111.
[4] ARABI S, KUNDUR P,HASSINK P. Small signal stability of a large power system as affected by new generation additions[C]//Proceedings of IEEE Power Engineering Society T & D Conference, 2000:812-816.
[5] 李玮.零功率切机保护的技术探讨与论证[J].华北电力技术,2014(10):15-20. LI Wei. Technology research and demonstration of zero-power tripping protection[J]. Electric Power Automation Equipment,2014(10):15-20.
[6] 王可山.零功率切机保护在大型火电厂的应用[J].能源与节能,2011(4):80-82. WANG Keshan. Application of zero-power tripping protection for large thermal power plant[J]. Energy and Energy Conservation,2011(4):80-82.
[7] 韩涌.零功率切机保护在吕四港电厂的应用[J].中国科技投资,2012(33):78-79. HAN Yong. Application of zero-power tripping protection in Lvsi power plant[J]. China Venture Capital,2012(33):78-79.
[8] 钱伟康,方宗达.影响时分割乘法器准确度的主要因素分析[J].上海理工大学学报,2002,24(3):268-271. QIAN Weikang, FANG Zongda. Analysis on main factors influencing accuracy of time-division multiplier[J]. University of Shanghai for Science and Technology,2002,24(3):268-271.
[9] 黄纯,何怡刚,江亚群,等.交流采样同步方法的分析与改进[J].中国电机工程学报, 2002,22(9):39-43. HUANG Chun, HE Yigang, JIANG Yaqun, et al. Analysis and improvement of synchronization[J]. Proceedings of the CSEE,2002,22(9):39-43.
[10] LU Zuling. An error estimate for quasi-integer period sampling and an approach for improving its accuracy[J]. IEEE Trans on IM, 1988,37(2):219-222.
[11] 张宝,杨涛,项谨,等.电网瞬时故障时汽轮机汽门快控误动作原因分析[J].中国电力,2014,47(5):18-22. ZHANG Bao, YANG Tao, XIANG Jin, et al. The cause analysis of steam turbine valve control misoperation caused by grid instantaneous fault[J]. Electric Power, 2014, 47(5):18-22.
[12] 杨涛,黄晓明,宣佳卓.火电机组有功功率变送器应用分析[J].中国电力,2016,49(6):53-56. YANG Tao, HUANG Xiaoming, XUAN Jiazhuo. Analysis on application of active power transducer in thermal power generating units[J]. Electric Power, 2016, 49(6):53-56.
[13] 周道军.变频器防低电压穿越分析[J].江苏电机工程,2015,34(2):37-40. ZHOU Daojun. The Analysis of frequency converter prevent low voltage ride through[J]. Jiangsu Electrical Engineering, 2015, 34(2):37-40.
[14] 姚新阳,黄学良,顾文,等.火电机组一类辅机变频器低电压穿越改造技术研究[J].电气技术,2015(12):26-30. YAO Xinyang,HUANG Xueliang,GU Wen, et al. Research on the low voltage ride through reconstruction technology for frequency converter of thermal power unit auxiliary equipment[J]. Electrical Engineering, 2015(12):26-30.
[15] WANG Xiaoyu,TAO Zhang,SHU liu, et al. Ride-through for important auxiliary equipment drive inverter[C]//Power and Engineering Conference, 2014:1-5.
[16] 董亮,马皓,王小瑞,等.基于滑动平均电压电流相移的数字化功率计算方法[J].电力系统自动化,2012,36(5):51-56. DONG Liang,MA Hao,WANG Xiaorui, et al. A modified digital power calculating method based on sliding averaging and phase shifting of voltage and current[J]. Automation of Electric Power Systems, 2012,36(5):51-56.